My Crew-cab restoration 'Crewie'

Discussion in 'Restorations' started by snowbaked, Sep 30, 2015.

  1. So it's started!!
    I'll have a full set of pictures at the end of the welding work, although will provide some updates as I visit the van in the Garage.
    Welding started last week. So far, no big surprises. In fact a lot of the chassis is in much better condition and won't need to be replaced.
    [​IMG]
    [​IMG]
    [​IMG]
    [​IMG]
     
    mp_90, paradox and Flakey like this.
  2. Sadly not much progress until this week due to an overrunning project at the garage. In the meantime I have ordered the main parts for the suspension including:
    4 inch narrowed link pin beam
    adjustable rear plates
    all the other little trinkets needed for this

    My next decision is the type of carbs to go for...

    Webber twin 40's
    or webber twin 34's (the single choke ones)

    I'm sticking with the standard engine for now (1600 Mexican)

    I've also removed the tow bar, if anyone is after one?
     
  3. More cutting...I just want the welding to start. Hopefully this week...so hopefully an update next week with some fresh metal.
    Now I just need to choose the carbs.
    [​IMG]
    [​IMG]
    [​IMG]
     
  4. redoxide

    redoxide Guest

    awesome wheels, those are the ones I had my eye on for my van, but needed to spend the cash on some more pressing parts :( whats the backspace on those ?.

    Cool project as well :) looking forward to updates
     
  5. @redoxide Backspace on the wheels as in the ET?
     
  6. redoxide

    redoxide Guest

    yep... :)
     
  7. redoxide

    redoxide Guest

    cheers..
     
  8. Finally, some progress...the doors are painted the correct colour and fitted, and the final piece is exposed at the back so the reference points are in place. Hoping for some fresh metal next week...

    [​IMG]
    [​IMG]
     
    rob.e likes this.
  9. i need them wheels. :) can't wait to see this done
     
  10. Which wheels?
     
  11. The sma ones
     
  12. is it finished yet??? :)
     
  13. No, welding should be done in the new year by end of Jan. All suspension parts purchased.
    I just booked the interior today...which is going to be awesome!!!
     
  14. good idea cutting before the lines and then cutting the new panel....be intresting what they do with the inner arch...

    looks a very tidy garage...
     
  15. The inner arch has come out and is being replaced. Finally new metal is going in this week
     
  16. :TTIWWP:
     
  17. [​IMG]
    I now have lots of pictures...you will wish you hadn't asked[​IMG][​IMG][​IMG]
    Just a couple...I'm 20,000 ft over Montreal and its landing time, so I will post the others later.
    Bernard Newbury booked for the inside
     
    paradox likes this.
  18. Flakey likes this.
  19. This side is nearly done, and should be done by the end of the week. The other side is slightly easier and doesn't have the cab door too.
    [​IMG][​IMG]
     