No mate, next Friday and Saturday techenders, leave Saturday evening and see what my lad Danny and a labourer I've hired have managed to rip out of the bathroom. Get last of the ceiling down floor boards up and wall plaster down on Sunday and sort out new plumbing. Reroute the toilet waste and start the dry lining on Monday finish Tuesday and start tiling the floor finish the floor Wednesday and start on the walls. Hopefully it will all be sorted by Friday. I had planned to start Saturday with my lad but suddenly realised it clashed with techenders, and my conscience wouldn't let me run off and leave him to do it on his own so I've got him his very own labourer. Then a weekend somewhere local and the spring camp the weekend after.
To be more even handed Ken, it's a field behind a pub. The camping plots are regimented, Toilet block is ok. As a camp site it's nothing special.